The layout design of welded pipe mills directly impacts workshop utilization and production efficiency. This article analyzes the space requirement differences between ZY series integral type (ZY16-ZY32) and split type (ZY45-ZY89) machines, providing a selection logic for different workshop conditions to avoid production bottlenecks caused by improper layout.
Dimension | Integral Layout (ZY16-ZY32) | Split Layout (ZY45-ZY89) |
Production Line Length | 18-22m (full process from uncoiling to unloading) | 28-35m (requires additional horizontal accumulator) |
Workshop Height Requirement | ≥4m (compatible with flying saw and roller table height) | ≥5m (space for horizontal accumulator + hydraulic system) |
Floor Area | 50-70㎡ (compact design) | 80-120㎡ (including accumulator, hydraulic station, etc.) |
Functional Integration | Integrated forming, welding, and sizing, no independent modules |
1.Maintenance Passage Reservation:
2.Power and Drainage Pre-Burial:
3.Future Expansion Interfaces:
Zhongyue Metallurgy Equipment Technology Co., Ltd, based in Zhangjiagang, China, pioneers precision metallurgical equipment manufacturing. With 150+ annual productions, our high-frequency welded pipe mills and H-beam lines empower automotive, medical, and renewable energy industries. Committed to R&D excellence and customer-centric innovation, we drive smart manufacturing evolution globally.
Contact Person: Mr. Darcy
Tel: 008613962217067
Fax: 86-512-58371721